Screenshare Multiple devices can connect at the same time and thus stream content to the table surface. This function does not require additional installation More >
Ceiling preparation Lamp+ Electrical connections Important: The ceiling must withstand a point load of 20 kg. More >
Find my AZ ID In MonteRosaOS On the device The AZ ID is located on the top of the ABUSIZZ products. More >
Lamp+ data sheet Specifications Connections The Lamp+ is electrically connected via a 5-wire power cable, L / N / PE (brown, blue, yellow). More >
Network requirements Requirement to connect our product to the Internet Specification Internet access Released in the local network Port release Internet Standard ports: 53, 80, 123, 443, More >